l Navigation & positioning of surface & underwater for subsea pipeline laying of DF1-1 (Nov, 2002 – Jun,2003)
l Pre-survey & post-survey using multibeam for landing segment of DF1-1(Nov,2002 )
l Navigation & positioning for WZ12-1B jacket installation (Nov,2002)
l Navigation & positioning for JZ9-3 NGIU jacket installation (Sep-Dec,2002)
l Surveying the C GPS network and II leveling for bulk cargo center Tianjin port (Oct, 2002)
l PL19-3 sub-sea pipeline laying and trenching (Jul – Oct,2002)
l Pre-survey for DF1-1 subsea pipeline route (Apr – May,2002)
l Navigation & positioning for DF1-1 jackets installation (Feb – Apr,2002)