l Navigation and positioning for BZ25-1 WHPA jacket installation (Dec,2003-Jan, 2004)
l Pre-survey for LD pipeline route (Nov, 2003)
l Pre-survey for LD jacket installation (Nov, 2003)
l Surveying for LD terminal pipeline land point (Nov, 2003)
l Pre-survey for WZ12-1 WHPA-WHPB subsea pipeline laying (Nov, 2003)
l Navigation and positioning for WZ12-1 WHPA-WHPB subsea pipeline laying (Oct-Dec, 2003)
l Navigation & positioning for Bonan subsea pipeline laying & trenching (Sep-Aug,2003)
l Navigation & positioning of surface & underwater for Donghae-1 jacket and deck installation in Korea (Jul – Aug,2003)
l Pre-survey/navigation / positioning for CFD11-1/2 jackets installation (May,2003)
l Navigation & positioning for QK18-2 – 18-1 pipeline laying & trenching (May – Jun,2003)
l Pre-survey & post- survey for pipeline route from QK18-2 to 18-1 (Apr,2003)
l Marine topographic surveying of Tanggu beach development (Mar,2003)
l Navigation & positioning for BZ25-1 jackets installation (Mar – Apr,2003)
l Pre-survey for BZ25-1 jackets installation (Feb – Mar,2003)
l Pre-survey for QK18-2 jacket installation (Feb – Mar,2003)