l Pre-survey for PY30-1 DPP jacket installation (Dec, 2005 – Jan, 2006)
l Navigation and positioning for WZ11-1/6-1/11-4N/12-1 PAP jacket installation (Oct, 2005 – Feb, 2006)
l Navigation and positioning for subsea pipeline installation of Indonesia SES Project (Oct, 2005 - Arp,2006)
l Pre-survey, Navigation and positioning for WHPC/B jacket installation of PL19-3 Project (Stage II) (Sep, 2005 – Feb, 2006)
l Pre-survey for jacket and pipeline installation of Indonesia SES Project (Aug, 2005 –Jan, 2006)
l Navigation and positioning for model installation of HZ21-1 Project (Aug-Oct, 2005)
l Navigation and positioning for CEP-WHPB cable installation of NB35-2 Project (Jul, 2005)
l Pre-survey for WHPB-CEP pipeline installation of NB35-2 Project (Jun, 2005)
l Navigation and positioning for WGPA-WHPC pipeline installation of CFD11-3/5 Oil Field Development Project (Stage II) (May-Jun, 2005)
l Navigation and positioning for pipeline installation and riser joint of LF13-2 Oil Field Development Project (May, 2005)
l Pre-survey for WHPA&WHPB jacket and pipeline installation of DF1-1 Gas Field Development Project (Stage II) (Mar, 2005)
l Pre-survey for jacket installation of HZ21-1B Gas Field Development Project (Feb-Mar, 2005)
l Pre-survey for WHPC jacket installation of CFD (Stage II) (Jan, 2005)
l Pre-survey for BZ25-1 (Stage II) subsea pipeline installation (Jan, 2005)