BZ28-2S oilfield subsea pipeline survey |
2014.1 |
QingHuangDao 32-6 oil field placement area survey |
2014.6 |
QingHuangDao 32-6WHPG paltform placement area survey |
2014.1 |
QHD32-6 oil field cable laying pre-survey |
2014.6 |
QHD32-6 oil field comprehensive adjustment development project pipeline trenching post-survey |
2014.5 |
Tanzania Mnazi Bay pipeline router survey |
2014.2 |
Boxi oil&gas treatment plant removal project KP22.38-KP24.44 trenching post-survey |
2014.4 |
BZ13-1 to QK18-1 subsea pipeline backfill post-survey |
2014.4 |
Weizhou natural gas synchronization project flexible pipe laying post-survey |
2014.8 |
KL10-1 oil field developmnt project KL-CEP jacket installation pre-survey |
2014.5 |
KL10-1 submarine cable route pre-survey |
2014.12 |
Caofeidian new single-point perimeter area multi-beam side scan project |
2014.8 |
BZ28-34 oil field development project jacket installation pre-survey |
2014.3 |
BZ28-34 oil field drill ship placement area side-scan survey |
2014.8 |
BZ26-2 WHPA to BZ26-3 WHPA cable trenching post-survey |
2014.4 |
BZ28-34 oil field development project flexible pipe laying post-survey |
2014.9 |
BZ28-34 submarine cable pre-surve |
2014.9 |
BZ28-34 oil field development project subsea pipeline laying presuvey |
2014.7 |
BZ28-34 oil field development project pipeline installation pre-survey |
2014.6 |
JZ25-1S deep trenching post-survey |
2014.2 |
JZ25-1S out-put pipeline project pipeline demage point survey |
2014.3 |
JZ25-1SCEP-Yingkou terminal output pipeline repairment project |
2014.4 |
JZ25-1S deep trenching section (KP39.2-KP40.7)backfill post-survey |
2014.7 |
JZ25-1S jacket pre-survey spud pit backfill project |
2014.8 |
JZ25-1SWHPD jacket installation pre-survey |
2014.9 |
JZ9-3 subsea pipeline laying survey |
2014.7 |
JZ9-3 oil&gas field swissair 05 abandoned anchor side-scan project |
2014.7 |
JZ9-3 pipeline trenching survey side-scan project |
2014.8 |
JZ20-2MSW、JZ20-2NW platform side-scan project |
2014.7 |
JZ9-3CEPD floating towing placement area double-frequency sounder measurement |
2014.9 |
JZ21-1 platform demolition side-scan project |
2014.9 |
Pinghuang oil&gas field platform installation pre-survey |
2014.9 |
Pinghu SDPP ploatform installation pre-survey |
2014.9 |
SZ36-1 oil field WHPN CEPN CEPO platform area side-scan project |
2014.9 |
CFD new single-point sand filling area multi-beam side scan project |
2014.7 |
LF7-2 subsea pipeline laying post-survey |
2014.1 |
Yinggehai project LD8-1-7 platform survey |
2014.11 |
Jintang port anchorage sweeping project |
2014.12 |
Enping oil fields area development project PY4-2-10-2 subsea pipeline post-survey |
2014.2 |
Pinghuang oil&gas fields development project HY1-1CEP port bend section post-survey |
2014.6 |
Huizhou refining outside testing project |
2014.1 |